Project Status

  • The original group buy has concluded as of April 2021
  • A small number of extras remain and are available on the Design page
  • Once all extras are claimed, the Black LEMO® Project will be considered 100% complete in its current traditional group buy state
  • The project will then continue at a future date (estimated mid Q4 2021) in the form of in-stock, non-group buy releases with availability as long as stock permits
  • In addition to this page, relevant updates will be pinged on Discord and Instagram

GB Information (archival reference)

  • Group Buy Window (ENDED): August 01 - 31 2020
  • Components: black chrome plated 0B LEMO® male + female 5-pin connectors
  • Source: factory direct — LEMO USA, Inc.
  • Country of Origin: Switzerland
  • Manufacturer Lead Time: 4-5 months
  • Cable Lead Time: batch-based after receipt of components
  • Connector-only Lead Time: shipping upon receipt, inspection, and sorting
  • Shipping Estimate: beginning mid Q1 2021

Cable Batches

  • Batch A: cable units #001-100, 3 week lead time after components arrival
  • Batch B: cable units #101-200, 6 week lead time after components arrival
  • Batch C: cable units #201-300, 9 week lead time after components arrival
  • Batch D: cable units #301-400, 12 week lead time after components arrival

GB Shipping Status (concluded)

    Expected Batch Windows (based on originally quoted time frames)

    • Batch A: Mar 02 - Mar 22 Complete as of Mar 22 2021
    • Batch B: Mar 23 - Apr 12 Complete as of Apr 08 2021
    • Batch C: Apr 13 - May 03 Complete as of Apr 20 2021
    • Batch D: May 04 - May 24 Complete as of Apr 30 2021